Wind in the Caribbean

This page keeps a running list of utility-scale and commercial wind farms in the Caribbean, with capacities and status as published by the owners, utilities, regulators and news reports listed under Sources. Last updated: October 2026.

Jump to: Aruba · Bonaire · Curaçao · Cuba · Dominican Republic · Guadeloupe · Jamaica · Martinique · Nevis · Puerto Rico

Aruba

Vader Piet wind farm, Aruba
Vader Piet wind farm, Aruba
Wind farmCapacityTurbinesNotes
Vader Piet30 MW10 × 3 MWCommissioned December 2009

Bonaire

Morotin wind farm, Bonaire
Morotin wind farm, Bonaire
Wind farmCapacityTurbinesNotes
Morotin10.8 MW12 × 900 kWWind-diesel hybrid with battery storage

Curaçao

Wind farmCapacityTurbinesNotes
Tera Kora I15 MW5 × 3 MWNuCapital
Tera Kora II17.25 MW5 turbinesAspiravi and NuCapital
Playa Kanoa15 MW5 × 3 MWNuCapital
Koraal Tabak—5 turbinesUnder construction. NuCapital and Aspiravi began work in February 2024 on the US$60 million project.

Cuba

Gibara wind farm, Cuba
Gibara wind farm, Holguín
Wind farmCapacityTurbinesNotes
Gibara I5.1 MW6 × 850 kWHolguín
Gibara II4.5 MW6 × 750 kWHolguín
Los Canarreos1.65 MW6 × 275 kWIsla de la Juventud
La Herradura 151 MW (design)34 × Goldwind 1.5 MWUnder construction in Las Tunas. Tower assembly began April 2026; the first 22 turbines (about 34 MW) are due online in 2026.
Gibara I wind farm, Cuba
Gibara I wind farm, Holguín
Los Canarreos wind farm, Isla de la Juventud, Cuba
Los Canarreos wind farm, Isla de la Juventud

Dominican Republic

Los Cocos wind farm, Dominican Republic
Los Cocos wind farm (Dominican Republic Ministry of Tourism)

The Wind Power database lists 15 wind farms totalling 558.1 MW in the Dominican Republic. The main farms in operation are listed below.

Wind farmCapacityTurbinesNotes
Los Cocos – Quilvio CabreraFour phases: 50.0, 25.2, 8.3 and 1.8 MW—Pedernales
Larimar49.5 MW——
Larimar II48.3 MW——
Agua Clara50.0 MW——
El Guanillo50.0 MW——
Granadillos50.0 MW——
Los Guzmancitos48.0 MW——
Poseidon II46.8 MW——
Puerto Plata – Imbert46.0 MW——
Matafongo34.0 MW——

Guadeloupe

Sainte-Rose wind farm, Guadeloupe
Sainte-Rose wind farm (Valorem)

Installed wind capacity was 57.2 MW at the end of 2024 across 10 wind farms, according to the regional energy observatory (OREC). The individual farm figures in its report add up to 56.1 MW.

Wind farmCapacityTurbinesNotes
Fond Caraïbes9.9 MW—Saint-François
Petit-Canal9 MW—Petit-Canal
Bellevue8 MW—Sainte-Rose. With L’Espérance 2, part of the 16 MW Sainte-Rose project (8 turbines) inaugurated January 2019.
L’Espérance 28 MW—Sainte-Rose
La Montagne 27.2 MW—La Désirade
Morne Constant5.4 MW6 turbinesMarie-Galante. Repowered in 2022 with battery storage, replacing 23 older turbines (TotalEnergies).
La Mahaudière3 MW—Anse-Bertrand
Petite Place2.475 MW9 × 275 kWMarie-Galante. Repowered in 2015 with storage and forecasting.
Désirade IV Souffleur1.7 MW—La Désirade
Grand Maison1.4 MW—Petit-Canal

Jamaica

Wigton wind farm, Jamaica
Wigton wind farm, Manchester
Wind farmCapacityTurbinesNotes
Wigton I20.7 MW23 × 900 kWManchester
Wigton II18 MW9 × 2 MWManchester
Wigton III24 MW12 × 2 MWManchester
BMR Jamaica Wind36.3 MW11 × 3.3 MWSt. Elizabeth
Munro3 MW4 × 750 kWSt. Elizabeth
Wind farm, Jamaica
Wind turbines, Jamaica
Jamaica wind energy
Jamaica wind energy

Martinique

Grand-Rivière wind farm, Martinique
Grand-Rivière wind farm (Positive Outre-mer / Outremers360)
Wind farmCapacityTurbinesNotes
Grand-Rivière (GRESS)14 MW7 turbines5.3 MWh battery smooths output. In service from January 2019.
GRESS 2 & 3 (Macouba)24 MW6 × 4 MWUnder construction, with a 10 MWh battery. Albioma acquired the project in April 2026; commissioning is scheduled for November 2026.

Nevis

Vergnet wind turbines
Vergnet wind turbines
Wind farmCapacityTurbinesNotes
Maddens (WindWatt)2.2 MW8 × 275 kWVergnet turbines; independent power producer supplying NEVLEC since 2010

Puerto Rico

Santa Isabel wind farm, Puerto Rico
Santa Isabel Wind (Pattern Energy)
Wind farmCapacityTurbinesNotes
Santa Isabel Wind101 MW44 × 2.3 MW Siemens GamesaPattern Energy. Operating since December 2012 under a 20-year PPA with PREPA.
Punta Lima26 MW13 × Vestas V100-2.0 MWNaguabo. Destroyed by Hurricane María in 2017, rebuilt and back in commercial operation in March 2024. Polaris Renewable Energy bought a controlling interest in 2025.

Sources

Other trackers: Solar PV · Hydro · Storage · Microgrids · Geothermal · RE Map

Compiled from utility, regulator, developer and government sources, with press reports where noted. Last checked: October 2026. Spotted an error or a newer project? Let me know.