Belize

Chalillo dam and reservoir, Belize
Chalillo dam and reservoir, Macal River

The three Macal River plants operate as a cascade: Chalillo stores water in its reservoir and releases it to Mollejon and Vaca downstream, both of which are run-of-river. The Government of Belize completed its purchase of the three plants from Fortis on 31 October 2025, renamed the company Hydro Belize Limited, and offered shares to the public in an oversubscribed share sale.

PlantCapacityOwner / operatorNotes
Mollejon25.2 MWHydro BelizeRun-of-river; built 1995
Vaca19 MWHydro BelizeRun-of-river; commissioned March 2010
Chalillo7.3 MWHydro BelizeStorage dam; built 2005
Rio Grande (Hydro Maya)3 MWHydro Maya LtdRun-of-river near San Miguel, Toledo District; rated site capacity in the PUC’s 2026 licence notice

Dominica

DOMLEC Roseau River hydro scheme, Dominica
DOMLEC hydro scheme on the Roseau River

DOMLEC operates three hydro plants on the Roseau River. Hurricane Maria caused major damage to the Padu turbine house and its conveyance system, and washed away the diversion weir upstream of Trafalgar along with about 400 feet of pipeline. DOMLEC has tendered work to make the Padu turbine building more resilient to hurricanes. Ratings are generator ratings in kVA as published by DOMLEC.

PlantCapacityOwner / operatorNotes
New Trafalgar3,520 kVADOMLEC2 × 1,760 kVA
Padu1,880 kVADOMLEC2 × 940 kVA
Laudat1,240 kVADOMLEC1 × 1,240 kVA

Guyana

Two run-of-river plants, Moco Moco and Kumu, now supply the Lethem Power Company grid in Region Nine alongside a 1 MW solar PV farm. In a test reported at Kumu’s commissioning, the two hydro plants supplied all of Lethem’s electricity for a full 24 hours. The proposed 165 MW Amaila Falls hydropower plant has not been built.

PlantCapacityOwner / operatorNotes
Kumu1.5 MW—New build; commissioned 11 July 2025
Moco Moco0.7 MW—Rehabilitated and upgraded from 500 kW; commissioned December 2024
Tumatumari1.5 MW—Defunct since the last of its two 750 kW turbines failed in the late 1980s; private rehabilitation proposed

Haiti

Péligre hydroelectric plant, Haiti
Péligre dam and hydroelectric plant
PlantCapacityOwner / operatorNotes
Péligre54 MW (rated)Électricité d’Haïti (EDH)Three turbines. A US$48.8 million refurbishment by Alstom–Comelex, funded by the IDB, KfW and OFID, aimed to restore the plant’s original rating.

Jamaica

JPS operates seven hydroelectric plants. Reported total capacity differs by source: the Government’s 2022 Integrated Resource Plan update lists JPS hydro at 28.7 MW for 2019 to 2021, while JPS gives 26 MW on its renewables page and about 23 MW on its business overview. Hydro supplied 3.2% of Jamaica’s net generation in 2021. The 7.2 MW Maggotty expansion on the Black River, commissioned in January 2014, added a new powerhouse alongside the original 6 MW plant completed in 1959.

The IRP’s preferred plan calls for 34.3 MW of new hydro capacity from 12 small plants, to be installed between 2027 and 2033. Published capacities for the individual St. Ann and Trelawny plants differ between sources, so they are not listed here.

PlantCapacityOwner / operatorNotes
Maggotty6 MW (1959) + 7.2 MW (2014)JPSSt. Elizabeth
Constant Spring0.77 MWJPSSt. Andrew; reopened December 2009
Lower White River—JPSSt. Ann
Upper White River—JPSSt. Ann
Roaring River—JPSSt. Ann
Rio Bueno A—JPSTrelawny
Rio Bueno B—JPSTrelawny

St. Vincent and the Grenadines

VINLEC operates run-of-river hydro plants at South Rivers, Richmond and Cumberland, all on St. Vincent. Under its Hydro Rehabilitation Project, the wood-stave pipelines at Richmond and South Rivers were replaced with glass-reinforced plastic (GRP) and both stations were automated for remote control. VINLEC shut down Cumberland 3 on 30 September 2025 because homes had been built close to its wood-stave pipeline; the station accounted for less than 2% of VINLEC’s output. Cumberland 1 and 2 remain in service.

PlantCapacityOwner / operatorNotes
Cumberland3.65 MWVINLECThree run-of-river stations, five units in total; Cumberland 3 retired September 2025
Richmond1.1 MWVINLEC2 × 550 kW Turgo units; opened 1962
South Rivers0.96 MWVINLEC3 × 320 kW after works completed August 2018; first entered service 1952

Suriname

Afobaka dam and power plant, Suriname
Afobaka dam and power plant, Brokopondo
PlantCapacityOwner / operatorNotes
Afobaka (Brokopondo)180–189 MW (sources differ)Staatsolie Power Company SurinameSix turbines; built in the 1960s. The state took over the plant from Alcoa on 1 January 2020. Staatsolie is studying a turbine upgrade and floating solar on the reservoir.