Energy Storage in the Caribbean
This page keeps a running list of megawatt-scale energy storage installations in the Caribbean, with capacities and status as published by the owners, utilities, regulators and news reports listed under Sources. Last updated: October 2026.
Jump to: The Bahamas · Barbados · Bermuda · Bonaire · Cayman Islands · Cuba · Curaçao · Dominican Republic · Grenada · Guadeloupe · Jamaica · Martinique · St. Eustatius · St. Vincent and the Grenadines · US Virgin Islands · Projects in the pipeline
The Bahamas
Chub Cay microgrid (Solar Builder)
Installation Power Energy Technology Application Commissioned Cost Chub Cay Resort microgrid 4 MW 10 MWh Lithium-ion Microgrid 2021 — Ragged Island microgrid (BPL) — 1,336 kWh Battery Microgrid Battery commissioning delayed — Microgrid battery 250 kW 500 kWh Lithium-ion Microgrid 2017 — Microgrid battery — 4 MWh Lead-acid Microgrid 2010 —
Barbados
BL&P battery storage
Installation Power Energy Technology Application Commissioned Cost BL&P battery 5 MW 20 MWh Lithium-ion Grid-connected 2018 US$10 million
Bermuda
BELCO battery storage
Installation Power Energy Technology Application Commissioned Cost BELCO battery 10 MW 5.5 MWh Lithium-ion Grid-connected 2019 —
Bonaire
Battery storage, Bonaire
Installation Power Energy Technology Application Commissioned Cost Grid battery 6 MW 6 MWh Lithium-ion Grid-connected 2019 — Grid battery 3 MW — Nickel-based Grid-connected 2010 —
Cayman Islands
Installation Power Energy Technology Application Commissioned Cost CUC Hydesville and Prospect substations 20 MW (2 × 10 MW) 20 MWh (2 × 10 MWh) Battery (Wärtsilä) Grid-connected 2024 —
Cuba
Installation Power Energy Technology Application Commissioned Cost Cotorro substation, Havana 50 MW — Battery Grid-connected 2026 —
Curaçao
Aqualectra battery storage, Hòfi Mooi (Curaçao Chronicle)
Installation Power Energy Technology Application Commissioned Cost Aqualectra, Hòfi Mooi 25 MW 45 MWh Battery (Wärtsilä) Grid-connected 2025 —
Dominican Republic
Installation Power Energy Technology Application Commissioned Cost AES Dominicana, Andrés 10 MW 30-minute rating Lithium-ion Grid-connected 2017 — AES Dominicana, Los Mina DPP 10 MW 30-minute rating Lithium-ion Grid-connected 2017 —
Grenada
Installation Power Energy Technology Application Commissioned Cost Off-grid battery — — Lithium-ion Off-grid 2010 —
Guadeloupe
Installation Power Energy Technology Application Commissioned Cost KISS battery 5 MW 30-minute rating Lithium-ion Grid-connected In service by 2024 —
Jamaica
JPS hybrid energy storage system
Installation Power Energy Technology Application Commissioned Cost JPS hybrid storage, Hunts Bay 24.5 MW 16.6 MWh Flywheel (3 MW / 49.5 MWs) and lithium-ion (21.5 MW / 16.6 MWh) Grid-connected 2019 US$27 million
Martinique
Installation Power Energy Technology Application Commissioned Cost EDF Novagrid, Le Lamentin 5 MW — Battery Grid-connected 2021 — Grand-Rivière wind farm (GRESS) — 5.3 MWh Battery Wind smoothing 2019 —
St. Eustatius
Installation Power Energy Technology Application Commissioned Cost STUCO solar park 1 MW 5.9 MWh after 2017 expansion Lithium Microgrid 2016 —
St. Vincent and the Grenadines
Installation Power Energy Technology Application Commissioned Cost Union Island microgrid 0.6 MW 0.637 MWh Lithium-ion Microgrid 2019 —
US Virgin Islands
Installation Power Energy Technology Application Commissioned Cost WAPA, Randolph Harley Power Plant, St. Thomas 9 MW 18 MWh Battery (Wärtsilä) Grid-connected 2024 —
Projects in the pipeline
Commissioning, under construction or contracted
Territory Project Size Status Aruba WEB Aruba / Wärtsilä 35 MW / 70 MWh EPC contract signed October 2026 Bahamas BPL / Wärtsilä, Blue Hills Power Station 25 MW / 27 MWh Contracted 2021 Guadeloupe TotalEnergies / Entech 8 MW / 8 MWh Commissioning planned H1 2027 Guyana GUYSOL solar-plus-storage, Linden and Essequibo 22 MWh and 12 MWh Linden works due to finish Q1 2027 Martinique GRESS 2 & 3 wind farm, Macouba 10 MWh Commissioning scheduled November 2026 Puerto Rico AES Puerto Rico, Guayama 110 MW / about 440 MWh, with 80 MW solar Energized for testing September 2026 Puerto Rico Genera PR / Tesla Megapack at six power plants 430 MW / 1,720 MWh Full deployment expected 2027 St. Vincent VINLEC / Smart Energy 7.5 MW / 15 MWh Contract awarded US Virgin Islands Fortuna Solar Farm, St. Thomas 25 MW Completion expected late 2026
Approved, tendered or planned
Territory Project Size Status Anguilla ANGLEC solar PV and battery storage — US$23.73 million secured from the Caribbean Development Bank Barbados BL&P battery application; government procurement 15 MW approved of 90 MW requested; 60 MW procurement FTC decision May 2024 Belize BEL San Pedro battery; government solar-plus-storage project 10 MW (part of a 40 MW plan); 40 MW solar + 20 MW / 80 MWh In development Cuba Three further batteries (Havana, Cueto, Bayamo) 200 MW in total with Cotorro Planned Dominican Republic ETED call for interest Up to 600 MW / 1,200 MWh Government targets at least 800 MW of storage by 2028 Puerto Rico Batteries at Arecibo and Santa Isabel 220 MW US$489 million DOE loan closed August 2026 St. Kitts SKELEC Basseterre Valley solar-plus-storage RFP 30.5 MW / 30.5 MWh with 50 MW solar RFP issued March 2026
Sources
Other trackers: Solar PV · Wind · Hydro · Microgrids · Geothermal · RE Map
Compiled from utility, regulator, developer and government sources, with press reports where noted. Last checked: October 2026. Spotted an error or a newer project? Let me know .